Kahanroba

EPCM Projects



Potash Project

Client: Iran Mineral Production and Supply Co (IMPASCo)

Project: Construction of Potash Plant (EPC)

Total Contract Value: 19,975,000 Euro

Location: Khor (Isfahan Province)

Services: Endorsement of Basic Engineering, detailed engineering, supply of equipment and machineries, supply of spare parts, implementation of Civil work, erection and installation of equipment and machineries, Commissioning of the plant, Training of Client’s Personnel.

Work commenced on July 2005 and completed on August 2007. The plant was designed to produce 50,000 Potash to be used as fertilizer. The plant was completed on July 2007 and was officially started up by minister of mines and industries. Potash plant produce potash from brine from playa, removing contaminants such as calcium chloride, sodium chloride and magnesium chloride. 


Aghdareh Gold Project

Client: Pouya Zarcan Aghdareh Co

Type: EPCM

Project: Construction of Gold Plant

Total Contract Value: 1.7 million US $

Location: Aghdareh (Takab-west Azerbayjan province) IRAN

Capacity: 500,000 ton/year ore

Services:

- Supervising of Dismantling in Indonesia Earthwork in Takab

- Design new foundation based in Takab climate and topography Refurbishment

- Re-erection and replacement of new equipment

- Design new utilities based on Takab conditions and Iranian mine ore analyze

- Piping and instrumentation

- Commissioning considering new conditions and data

- 6 months operating

Work commenced on April 2004 and Completed on April 2005 (12 months). The equipment and machineries were used equipment of Rawas plant in Indonesia which were dismantled, packed, marked and transported to Pouya Zarcan Site in Takab.


Zinc Smelter Plant (NILZ)

Client: National Iranian lead and zinc Co (NILZ)

Type: EPCM

Project: Zinc plant

Location: Zanjan (Iran)

Total Contract value: $350 thousand (1995)

Services:

- Project management

- process and design engineering (Basic and Detailed)

- Procurement services

- Construction management, inspection and commissioning

Work commenced on early 1996 and completed on April 1999 (36 months). The plant was designed to produce 15,000 tpy zinc Ingot by electrolytic process.

The plant was started up officially by president Khatami on September 1999.

Engineering design in all disciplines covering the following plant areas:

Leaching area
Purification area
Electrowinning area
Magnesium bleed off and waste water treatment area
Melting and casting area
Reaction and Filtration
Residue pond
Zinc dust production

Process and control room buildings