FeSi production plant

Client: Ferosilis gharb pars company (FeSi Co) a subsidiary Co. of MIDHCO (Middle East Industries Development Holding Co)

Type: EPC

Project: Construction of FeSi production plant

Total Contract Value: 7 million Euro

Location: Jokar-Malayer (Hamadan Province)

Services: Basic and detailed engineering, supply of equipment and machineries, supply of spare parts, implementation of civil work, erection and installation of equipment and machineries, commissioning of the plant.

Work commenced on July 2011 and completed on June 2013. The plant was designed for production of 12000 tpy Ferro Silisium (FeSi).

Engineering design in all disciplines and supply of equipment and machineries for whole plant units covering the following plant areas:

- Raw material handling & day bins

- Arc furnace

- Rotary of zinc carbonate as a feed taping: Casting & Crushing

- Cooling water system

- Finish product handling

- Gas includes: Conditioning tower, bag filter and stack de-dusting & dust handling

- Utility


Azerbaijan Gold Project

Client: AIMC (Azerbaijan International Mining Company)

Project: Gold Plant of gedabey (2,000 kg gold/year)

Total Contract Value: 450,000 US $

Location: Azerbaijan

Services: Supervision of final installation and making required modifications on gold plant, commissioning and operation of plant, training of local stuff, design of piping system for SART plant, commissioning of SART plant and preparing operation manual.

Work commenced on August 2009 and completed on February 2010. The plant was designed to produce 2,000 Kg pure gold.

The gold plant was officially started up on May 2010 by president of Azerbaijan.

Plant includes heap leaching, RIS (resin in solution) vessels, elution column and electrowinning cells.


Kharg Sulphur Storage Plant

Client: Kharg Petrochemical

Type: Turnkey

Project: Sulphur Storage and Mechanization of Sulphur handling project (EPC)

Location: Kharg Island

Total Contract Value: 3.5 million US $

Services: Basic and Detailed Engineering, supply of equipment and machineries, supply of spare parts, Construction of covered area for Sulphur storage, Mechanization of Sulphur handling from Sulphur production plant building up to Sulphur storage and from Sulphur storage up to ship loader, Commissioning of the plant.

Work commenced on March 2003 and completed on June 2006. The project was constructed in two phases. Each phases was included as construction of one covered area for storage and discharging equipments of sulphur granule.


Calcination Plant

Client: Iran Zinc Mines Development Co (IZMDC)

Type: Turnkey

Project: Construction of calcination plant

Total Contract Value: 3 million US $

Location: Mehtar (Zanjan Province)

Services: Basic and detailed engineering, supply of equipment and machineries, supply of spare parts, implementation of civil work, erection and installation of equipment and machineries, commissioning of the plant.

Work commenced on November 1999 and completed on February 2001. The plant was designed for calcination of 70,000 tpy zinc carbonate in rotary Kiln.

Engineering design in all disciplines and supply of equipment and machineries for whole plant.

units covering the following plant areas:

-Raw material handling area
-Crushing
-Rotary kiln for calcination of zinc carbonate as a feed
-Cooling drum for cooling product
-Grinding of product

-Gas dedusting system includes: Conditioning tower, bag filter and stack